Sunday, June 17, 2012

Boat Work June 2012

Thank you Nathan, Serge and Jason

Electrical

  • Connected lights of the newly installed compass
  • Connected the sailing instruments
    4
  • Connected the drive unit of the autopilot
  • Cleaned up further the connections to the instruments and drive unit with solidly screwed on terminal blocks with splash guards

3

Navigation

  • New compass installed
  • Wooden areas secured with epoxy to avoid rot and moisture infiltration

1

Short-handed Sailing

  • New support for Tiller Autopilot 2 'Ray' set up on deck (the regular one wasn't strong enough and the pilot came popping out of it)

Long-Distance Sailing

  • Forward flotation aid (opti buoys) secured safely and out of the way

No comments: