The never ending list :)
BEFORE SATURDAY (for farallones race)
Fix deck level nav lights (LED on boat, it's just a matter of cramp fitting them in)
plug in and test AIS (all parts shoudl be on boat, a matter of cramp fitting everything in and fixing rather loose-looking VHF connector :)
Heatshrink inside of solar panel connectors and pull inside the boat all the wiring that is outside in a bundle right now...Will look a lot cleaner (takes about 2 min)
BEFORE TUESDAY (for Long Pac inspection)
Install new connector for spare autopilot
swap out lifeline
Radar reflector up in rig
Install big solar panel (electrical install is done, it is mainly turning blocks, screw onto the pushpit type work)
Food and drinks (even though clearly, it won't be the food and drinks for July 6...)
medical kit and manual ready
fix way to secure companionway sliding hatch from inside/outside the boat
bailer for grab bag
Test tiller autopilot
Set up top of mast strobe kit
Tape up sail number on storm sails
BEFORE July 6 (for Long Pac)
fix NKE autopilot
Set up external spare halyard
Set up turning block so one person can hoist themselves up the mast
fix Keel scratches and paint from grounding
Add anti-chafe measures on halyards (spliced in)
Fix patch on spinnaker (runner)
Hoist trysail
debug laptop
LATER
Mount stereo (Nat has holder) and check with 4 sets of speakers + iPod
Service winches
replace jib car bearings
investigate and fix outhaul line or cleat
change outhaul cable
buy new plexiglas bottom door for Elise (to match the top one)
instrument covers - ' compass covers (no longer fit) and we need a new cover for NKE
Add instrument repeater on the mast for boat speed
No comments:
Post a Comment