Summary of tasks done for LongPac
- remove malware from boat computer and test
- Change jib halyard into non stretchy line
- Add jackstays and offshore gear
- Install big solar panel
- Add diamond to lifelines
- Fix connectors for small solar panel
- Fix second instrument panel
- Radar reflector up in rig
- Update deviation card for 2nd compass
- Install big solar panel
- Test tiller autopilot
- Fix NKE autopilot
- Set up external spare halyard
- Set up turning block so one person can hoist themselves up the mast
- Service winches
- Set up dodger
Still to do:
- Set up big engine with new lock
- Shop for food and water
- clean up, set up and test computer
- Remove offshore gear that is not required for single-handed longpac
- Set up liferaft on boat
- Learn to use the AIS system (some of it will be done at home)
No comments:
Post a Comment