Monday, July 4, 2011

LongPac Prep

Summary of tasks done for LongPac

  • remove malware from boat computer and test
  • Change jib halyard into non stretchy line
  • Add jackstays and offshore gear
  • Install big solar panel
  • Add diamond to lifelines
  • Fix connectors for small solar panel
  • Fix second instrument panel
  • Radar reflector up in rig
  • Update deviation card for 2nd compass
  • Install big solar panel
  • Test tiller autopilot
  • Fix NKE autopilot
  • Set up external spare halyard
  • Set up turning block so one person can hoist themselves up the mast
  • Service winches
  • Set up dodger

Still to do:

  • Set up big engine with new lock
  • Shop for food and water
  • clean up, set up and test computer
  • Remove offshore gear that is not required for single-handed longpac
  • Set up liferaft on boat
  • Learn to use the AIS system (some of it will be done at home)

 

No comments: