Nat, Patrick and Sharif
Wednesday, April 28, 2010
AdMob Sailing Offsite
- Ergo (with Chris and Belle)
- Great White (with JP and Deb)
- Wetsu (with Phil and Jim)
- Elise (with Nat and Patrick)
couple of enhancements made to Elise
- Backstay can now be adjusted from either the back or the mainsheet post
- The twings attach point to the deck has been moved forward
- The interior lights work again...
- The steaming light has been disconnected from the GPS...(and has yet to be reconnected)
- The little hole through which the mast wires get into the boat is now sealed off
- The old (now just for cruising) mainsail now fits perfectly inside the mast...and through the pre-feeder
- Elise also has a new hot knife
Saturday, April 10, 2010
Monday, March 29, 2010
Training w/ Dan
- have one crew dedicated to counting down time
- have one crew dedicated to traffic and measuring distance to the line (particularly in strong current)
- have the crew call for puffs (and have the main sheet out of the cleat so the main can be released effortlessly when the puff hits)
- if the boat is not in the groove yet, head down, release the main, get the boat speed up and then slowly work on pointing
- make it easier to pull in the outhaul (maybe add mechanical aid)
- replicate the same purchase ratio below deck for the backstay so it can be adjusted from the main sheet post directly by the driver
- feed more croissants to the crew to increase weight on the rail before each rail, we're usually 50 pounds below legal limit
- Loosen the lifelines to the legal limit
- Tighten up the aft lowers (although Elise will generally be dynamically tuned anyway)
- Install a repeater for boat speed up on the mast, with big bold letters
- Launch from the hatch (already doing that now)
- Bring the twings further forward - and not worry as much about the downhaul
- play the sheet much more than the guy during jibes
- have one person on the sheet and one person on the guy during jibes
- have a person helping the bowperson for takedowns in heavier winds if necessary (particularly leeward douse)
- actively manage weight downwind
- actively manage pole tip (spinnaker wanted to fly a lot higher this time around)
- have a crew bring in 90% of the main during the mark rounding (another crew is actively bringing in the jib) and 1 is at the bow cleaning things up, 1 is up on the rail and the driver is pointing the boat up and will finish the main trim
- Sand the bottom a bit better
- See if there is anything that we can still take off the boat (took a lot of stuff off already though) when we go buoy racing
- backstay below deck purchase change (and range so we can adjust the exact same way as we would above deck)
- add mechanical advantage to the outhaul adjustment
- move twings forward
- tighten up aft lowers as we go into heavy air season
- decouple steaming light from GPS below...
- add boat speed repeater on the mast
- replace taktik
- sand bottom
Elise Health Bulletin
Monday, March 22, 2010
Crewed Lightship - 201

Tuesday, March 16, 2010
Double-Handed Lightship
France forges aheadPurchased from Lyons Imaging (www.lyonsimaging.com)
Big Daddy 2010 photos


Photos purchased from Lyons Imaging (www.lyonsimaging.com)
More Spring Keel Photos
We had some really good speed upwind, and very smooth legs - we did two things wrong in the first day and everything else right (as in really good)
We had good speed downwind, and did play currents well, we actually did pass boats on both upwind and downwind legs, and lost our advantage rounding the marks and calling currents at the marks on the second day, and pretty much tacking and rounding the windward mark on the first day.Purchased from H20shots (Camera at Large) - www.h2oshots.com
Sunday, March 14, 2010
Big Daddy - Message from Mark
Not sure on the results yet, but we had a great finish. The downwind leg was well thought-out, well-executed, and resulted in a great opportunity at the finish line that Nathan aggressively took advantage of. Bravo.
I thought our upwind leg to Alcatraz was good, and on the run to Angel Is we certainly picked up a few boatlengths. We cut it a bit too close on the approach to Alcatraz (bad communication) and then went a bit too wide as we
rounded (my bad) but neither cost us much. Other than that, our only big mistake was a bad start, and a lot of that can be blamed on the DELAY, the wind and the committee boat, but of course the final answer is to BE MORE
PREPARED.
Andrew had a great first race on foredeck!"
Wednesday, March 10, 2010
Wednesday, March 3, 2010
Berkeley Yacht Club will be hosting the 2010 Sarcoma Cup
Howdy Sailors –
In our continuing efforts to provide you with the best possible regatta experience, and after months of top secret meetings with deep-pocketed sponsors, interviewing prospective host yacht clubs, carefully reviewing their extensive application forms, and performing thorough background checks, we have finally reached a decision. Our complex application scoring process heavily weighted kick-ass sailing, parties that would be illegal in most states, and dedication to this charity cause. One applicant towered above the rest…
…those wild and crazy folks at the Berkeley Yacht Club will be hosting the 2010 Sarcoma Cup !!! Congratulations BYC !!
Unfortunately, we are still sworn to secrecy on some of the event’s details. You may have heard rumors about special appearances by some of the SI swimsuit models at this year’s Sarcoma Cup. At this time I can neither confirm or deny these rumors. As soon as we can declassify the rest of the event details we will be making further announcements. Stay tuned.
So, far the following fleets have committed to the event and have it on their calendar:
J105
Express 27
Wabbit
Alerion 28
Open 5.70
Viper 640
Santana 22s (Sunday)
So, if your fleet is not on this list, now’s the time to fix that J. Do your sailing friends a favor and pass this email on.
We will also be posting updates at http://www.sarcomacup.org/
Cheers,
Mark Lowry
2010 Sarcoma Cup Regatta Co-chair
Practice with Moxie Man
- we practiced starts (where to be with respect to the line when, how to work with the bowperson to count down the distance to the line, when to jybe Vs tack during the sequence, how to hit the line w/ speed, etc...) - out of 6 or 7 starts, we hit 4 or so really well, one was 5 seconds late and one was on time but not with full speed. Our strategy going forward will be to actually take a quiet portion of the line, say 1/3 down, or through the middle of the line - not because it is the best location on the line but because given our level of skills on the start line in such a competitive fleets, we want to favor a) clean air and b) complete control of when we hit the line. So we don't want to have to worry about other boats around us. It'll just be us and the line and our goal every time will be to cross the line right on the mark fully powered up.
- we practice upwind boatspeed (and discussed a better way to run the backstay so it can be adjusted entirely from the traveler post) - in 15 knots of wind or so. We managed to keep the boat nicely flat, slightly pinching, keeping her in a very narrow groove, not moving the tiller very much, using loads of outhaul/cunningham and playing the backstay a lot - focusing on the head sail and releasing the main in big puffs. Having a full crew hiking out hard and the driver's butt on the toe rail made a huge difference. Overall, in these moderate wind, the boat felt like it was just nicely trotting around. Very relaxing.
- we practice jibes - and we will make a couple of changes to the way we handle things. 1) always launch from the forward hatch when on the Bay and use the shackle to keep the spin halyard out of the way of the jib (the part is actually planned for that purpose, but we have rarely used it). Saves repacking, minimize weight on the foredeck during setup. Just needs to prepare this ahead of time. Nice tip during a jibe for the driver: follow the spinnaker, eg point the bow at the middle of the sail at all times to keep it full. Finally, making sure to gather the foot of the spinnaker (eg blow the guy and release the sheet), before releasing the halyard which can then be done at a leisurely pace.
Elise Traveler Car
Race Committee with Sarcoma Cup PRO at RYC midwinters


Thursday, February 11, 2010
Health Bulletin
Monday, February 8, 2010
Elise's new mast maiden voyage

Belle, Suzanne, Pete and his mom and I took Elise out for her new mast's maiden voyage. Picked up a couple of things that still need to be fixed, but overall, looking pretty good!
- dynamic tune the boat (incl. for heavier/stormy weather)
- add cam cleat (otherwise, no biggy, we can run the halyard back)
- replace tiller (the current one is starting to crack itself loose...)
- extend jib car track forward by a couple of inches
- connect tri-color to the connector box
- fix emergency nav light (deck level, for some reason, they don't light up anymore. Either a bulb change, or a loose/corroded connection somewhere probably)
- Change a flush Harken block used by the Vang line
- add stereo system (it will be nice to have this for Vallejo)
- re-paint deck (it's becoming very see-through)
Sunday, January 31, 2010
Elise Update
- Elise mast is up and lines are run through the mast, also got new chainplates
- New halyards/topping lift delivered
- Fiber glass dent is patched up
- New mast already has autopilot windvane + masthead fly + VHF antenna rigged up + ocean tri-color
- New mast also has a steaming light to be perfectly legal...
- Boom is up and new pin was purchased
- Lifeline swapped so now it's Bay height
- Teak oiled settees
- Changed 2 base corners for the cooler
- Ran halyards/vang/lines, etc....back + added shackles
- Changed bungees at the bow
- Removed clutch and poured epoxy (ready for a drill/change to new clutch)
- Cleaned bilge
- Swapped battery (to a charged one)
- Took picture of old cruising main => coat room for repair
- Picked up and loaded new cruising main
- Checked and flaked racing #3
- Changed lines for boat cover
- Fixed cup holder
- Added storage solutions (2 mesh bags) + 1 gear hammock + a cool gear bag
- Removed a lot of crap from the boat that needs to dry out
- Serviced port winch (keeps freezing up with salt, might have to replace it soon)
- New emergency VHF is on
- Found fitting power cord for the stereo
- Backstay
- Static tune rig
- Connect electrical wires from mast
- Permanently fix fiber glass
- Extend forward jib car track by a couple of inches
Thursday, January 28, 2010
Monday, January 18, 2010
Photos from the Sarcoma Cup '09

oopsie - the spinnaker tore at that time! Thank God for the overnight service North Sails provided!
Great photo - you can see the tear in the spinnaker. Top left cornerGuest Post - Benoit
Sunday, January 17, 2010
Some pretty cool photos of Elise (and other boats)
Elise News
- new mast made it to the Bay Area
- old and new masts are at the Rigger's
- old mast is getting stripped of its clothes so that new mast will look like old mast
- spin and jib halyards are ready
- topping lift is ready
- we had a new (spare) main halyard
- Not all the halyards are broken but we decided that their integrity was compromised...
- Planned delivery of the new lines: Jan 19. The new mast has tag lines installed in the mast so it should be very easy to install the halyards
- Weather permitting: this week or next
- Now that the mast is out of the way, it will be easier to do that














.jpg)






















