At least, we did get a good day's work today (and this week with professional help)
Pro help
- Elise mast is up and lines are run through the mast, also got new chainplates
- New halyards/topping lift delivered
- Fiber glass dent is patched up
- New mast already has autopilot windvane + masthead fly + VHF antenna rigged up + ocean tri-color
- New mast also has a steaming light to be perfectly legal...
Beethovens' help [thank you Heather, Pete, Nicolas, Andy and Nathan]
- Boom is up and new pin was purchased
- Lifeline swapped so now it's Bay height
- Teak oiled settees
- Changed 2 base corners for the cooler
- Ran halyards/vang/lines, etc....back + added shackles
- Changed bungees at the bow
- Removed clutch and poured epoxy (ready for a drill/change to new clutch)
- Cleaned bilge
- Swapped battery (to a charged one)
- Took picture of old cruising main => coat room for repair
- Picked up and loaded new cruising main
- Checked and flaked racing #3
- Changed lines for boat cover
- Fixed cup holder
- Added storage solutions (2 mesh bags) + 1 gear hammock + a cool gear bag
- Removed a lot of crap from the boat that needs to dry out
- Serviced port winch (keeps freezing up with salt, might have to replace it soon)
- New emergency VHF is on
- Found fitting power cord for the stereo
What needs to be done this week
- Backstay
- Static tune rig
- Connect electrical wires from mast
- Permanently fix fiber glass
- Extend forward jib car track by a couple of inches
Then next personal project is to add the stereo...
No comments:
Post a Comment